Manchester Airport Tunnel Lighting Upgrade

 

 

Discover how Artech Lighting delivered a modern LED lighting solution for one of the UK’s busiest airport environments.

65%

reduction in energy

Improved

visibility and safety

8 week

project turnaround

Access the full case study here:

What we did

Artech Lighting delivered a high-performance LED lighting solution for a critical tunnel infrastructure project at Manchester Airport, helping reduce energy consumption by 65% whilst improving illumination, reliability and long-term operational performance.

With a tight turnaround time, we took the existing geartray back to our Durham HQ, where it was redesigned by our team of experts and fitted with our energy efficient LED boards. To maximise performance and achieve the optimum lighting effect, we also designed a new frame and diffuser specially for the application. The upgraded system was returned to site for retrofit installation, all within an eight-week timeline, saving our client time, money and unnecessary onsite disruption.

We work to Revive luminaires, breathing new life into old, energy-hungry lights, providing efficiency without the compromise on quality.

By designing and manufacturing solutions that deliver a return on investment within 6 months, organisations can significantly reduce energy costs and carbon emissions simultaneously.

The results

  • 65% reduction in energy consumption
  • Improved visibility and safety for tunnel users
  • A future-proof solution with reduced maintenance requirements
  • Better performance and reliability
  • Lower long-term operating costs
  • Enhanced sustainability

Discover what you can save today.

Speak to our team of experts to find out how a modern lighting upgrade could reduce operating coss across your organisation.
Click Here
Artech Lighting Made In Britain Logo

Case Studies Brochure

(PDF, 2.3mb)

© Artech Lighting. All rights reserved. Privacy Policy | Site by Creo Comms